Regency Estate Clubhouse · Dombivli
73 TR multi-system clubhouse retrofit
ChallengeA clubhouse with a gym, banquet hall and lounge needed three different HVAC types matched to very different room shapes, without disrupting residents.
SolutionHeat load calculated room-by-room: split units for smaller rooms, cassette units for the lounge, ductable for the banquet hall — 73.0 TR total.
ResultZero callbacks in the first year, confirmed directly by the managing committee.
Read case study →
TCS Logistics · Mumbai
16 HP VRV office fit-out
ChallengeAn office needed centralised, zoned cooling across multiple floors without the footprint of individual split units.
SolutionA single 16.0 HP VRV system designed for independent zone control, commissioned and handed over on schedule.
ResultTwo years on AMC, with breakdown response consistently under a few hours.
Read case study →
M.K. Ghare Jewellers · Kandivali
62 TR across six retail locations
ChallengeA retail jewellery chain needed consistent cooling standards across six separate stores, not six different vendors.
SolutionOne team handled sizing, installation and commissioning at every location — 62.0 TR of split systems, to the same spec each time.
ResultA single point of contact across all six stores, with consistent service store to store.
Read case study →